Construction sequences for large pipe; clearing, grading, trenching, stringing; techniques for smaller pipe and narrower right of way; joining of HDPE; right of way; salvage, automatic welding; ultrasonic and radiographic inspection; record keeping; as built drawings and alignment sheets; hydrostatic testing; purging and commissioning; ground bed installation; cathodic protection.
This course may not be repeated for credit.
Prerequisite(s)
- Admission to the Graduate Certificate in Pipeline Engineering.
Sections
| LAB 1 | M 18:00 - 20:45
| | | | |
| Notes:
|